“TPP VARNA” EAD

2009
Chemical and pharmaceutical industry

Project development, specification, delivery, mounting wiring and putting into exploitation of 2 pcs. regulators for excitation of the DC motors 6KV of the mills of Block 5 in “TPP VARNA” EAD. The scope of the work includes project development, equipment and electrical boards specification and delivery, electrical boards assembly, start-up, commissioning and putting into exploitation.

„POATIE” Ltd.

2009

Development and implementation of co-generator thermal energy measurement and control systems. The scope of the work includes thermal energy measurement equipment specification, delivery, on-site mounting, programming, start-up, commissioning and putting into exploitation.

„Profeks Bioproducts” Ltd.

2009

Commissioning adjustment and putting into exploitation of the field control and measurement equipment in Bio-ethanol plant – Gorna Malina. The scope of the work includes parametrization, commissioning and adjustment of regulating valves, on/off valves, level measurement and level signaling sensors, flowmeters, pressure transmitters, temperature transmitters, pumps, PH-meter, and density meter.

“Prista Oil Holding” EAD

2010

Development and implementation of control system for excisable goods according to the requirements of Customs Agency shown in Regulation № 3 / 19.02.2010. The scope of the work includes project development of the system, equipment delivery, electrical and control boards assembly, controller programming, onsite mounting of the equipment, implementation of automatic reading of the information, start-up, commissioning and putting into exploitation.

“Carlsberg Bulgaria” AD

2010
Food industry

Development and implementation of control system for excisable goods according to the requirements of Customs Agency shown in Regulation № 3 / 19.02.2010. The scope of the work includes project development of the system, equipment delivery, electrical and control boards assembly, controller programming, onsite mounting of the equipment, cabling, implementation of automatic reading of the information, start-up, commissioning and putting into exploitation.

“Balkanpharma Troyan” AD

2010
Chemical and pharmaceutical industry

Replacement of relay – contactor management scheme of 7 machines in workshop ”Unguents” with management system based on programmable controllers SIMATIC S7 200 and SIMATIC S7 1200. The scope of the work includes equipment delivery, programming of controllers and operator panels, onsite mounting and wiring of the equipment, start-up, commissioning and putting into exploitation.

Outwoods Automation Ltd. – United Kingdom

2010

Development and implementation of SCADA PCS7 system of DC Crudgington plant part of DAIRY CREST – UK and replacement of the existing Mitsubishi controllers with SIEMENS controllers. The scope of the work includes configuration and specification of the equipment, controllers and SCADA system programming, onsite start-up, commissioning and putting into exploitation.

Outwoods Automation Ltd. – United Kingdom

2010

Development and implementation of PLC/HMI management system of Butter Reworker installation in DC Crudgington plant part of DAIRY CREST – UK. The scope of the work includes configuration and specification of the equipment, controllers and HMI system programming, onsite start-up, commissioning and putting into exploitation.

Bright Engineering Ltd.

2010

Development and implementation of system for automatic level regulation of container 5000m3 in TPP VARNA EAD. The scope of the work includes equipment delivery, programming of controller, programming of WINCC SCADA system, onsite mounting, start-up, commissioning and putting into exploitation.

“Carlsberg Bulgaria” AD

2010
Food industry

Development and implementation of automation system for transporting installation management and malt batching in brew house. The scope of the work includes project development, equipment delivery, electrical and control boards assembly, building and construction work, programming of controller and operator station, start-up, commissioning and putting into exploitation.