SVILOSA AD

2004
Mechanical engineering industry

Project development of system for monitoring, control and management of Cellulose Drying Machine. The work on the project includes complete project development – Electrical Part and Automation Part, and specification of all the control, drive and field equipment.

CUMERIO MED AD

2005
Mechanical engineering industry

Complete turn-key automation system for management, monitoring and control of Converter Spray Chamber No 2 in Metallurgical Department. The system is based on SIMOCODE PRO motor control units and PCS7 automation system, production of SIEMENS AG. It realizes total management and control of all the processes in the Converter Spray Chamber. The scope of the work includes project development, demolition of the existing equipment, mounting of new equipment, cables and cable trays laying, panel assembly, programming, commissioning, adjustment and putting into exploitation.

SOLVAY SODY AD

2005
Mechanical engineering industry

Automation system for management and control of Anthracite Screening and Crushing Installation. The system I s built on the basis of ET200S distributed control periphery, SIMOCODE PRO motor control units, production of SIEMENS AG. It realizes automatic management of the installation with all necessary for the correct work signal processing and information transfer to upper level controller TDC3000 of HONEYWELL for additional data processing visualization and archiving. The scope of the work includes project development, control board assembly, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.

SPARKY AD - Rousse

2005
Mechanical engineering industry

Management and control system of multi-purposed machine. The system is built on the basis of programmable controller SIMATIC S7 314С-2DP and operator panel ОP77А, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.

SVILOSA AD

2005
Mechanical engineering industry

Assembly of power substation main boards according to project for Cellulose Water Removing and Drying Machine. The scope of the work includes assembly, onsite mounting, commissioning and adjustment of PRIZMA main boards and busbar system on the basis of equipment of Schneider Electric company.

DUNARIT AD

2006
Mechanical engineering industry

Management and control system of galvanization line. The system is built on the basis of programmable controllers SIMATIC S7 314, SIMATIC S7 226 and operator “Touch” panel TP177A, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, boards assembly, mounting, wiring, programming, commissioning, adjustment and putting into exploitation

SOLVAY SODY AD

2006
Mechanical engineering industry

Automation of installation for heavy loose soda – includes building of management, control and visualization system on the basis of programmable controller SIMATIC S7 313C-2DP and operator “Touch” panel TP170A, production of SIEMENS AG – Germany. The scope of the work includes project development, equipment delivery, control board assembly, programming, commissioning, adjustment and putting into exploitation.

FICOSOTA SYNTEZ AD

2007
Mechanical engineering industry

Dismantling, transportation, mounting, commissioning, adjustment and putting into exploitation of conveyor line for sanitary pads and pampers. The scope of the work includes taking the line into pieces, conservation, packing and transportation to FICOSOTA SYNTEZ AD, onsite mounting and cabling, commissioning, adjustment and putting into exploitation.

SOLVAY SODY AD

2008
Mechanical engineering industry

Development and implementation of management software for 14 AC motors in Large Crushing Frame. The scope of the work includes application software development, commissioning, adjustment and putting into exploitation.

KPZ AD

2008
Mechanical engineering industry

Development and implementation of furnaces C3 and C5 management systems. The scope of the work includes working project development, delivery of equipment, control boards assembly, on-site mounting and wiring of control boards and equipment, programming, commissioning, adjustment and putting into exploitation.