Water purifying stations for drinking water in Kosovo – Viti,Gjilan,Ferizai and Velekince (with Fela Plannung – Switzerland)

Description: development and putting into exploitation of automation systems for management and control of all the processes in each station.

  • SIMATIC S7-315 PLC
  • 5 SIMATIC S7 151-8
  • distributed periphery
  • 2 redundant SCADA operator stations
  • leased line communication with pumping station

BLACKBURN STARLING Ltd. – United Kingdom

1998

Start-up, commissioning, adjustment and putting in exploitation of centrifugal moulding plant in Teheran – Iran. The scope of the work includes start-up and adjustment of the field devices, programming, start-up, commissioning and adjustment of the Allen Bradley controllers and SCADA system, personnel training.

FELA plannungs AG - Switzerland

2001/ 2002

Reconstruction and rehabilitation of 3 water purifying stations for drinking water in Kosovo. Project, development and putting into exploitation of PCS7 automation systems for management and control of all the processes in each station. The systems include project, construction work, mounting of SIMATIC S7 controllers, OS77 WINCC operator stations, low voltage switchgear and controlgear, electrical cabinets, wiring, programming, adjustment, application software development, information processing, visualization, archiving and storing by operator stations OS77/WINCC.

FELA plannungs AG - Switzerland

2002

Automation system for management and control of the dam locks in Jablanica, Kosovo. The system is built on the basis of SIEMENS equipment and realizes total management and control of the work of the dam locks both in automatic and hand-operated modes.

FELA plannungs AG - Switzerland

2003 / 2004

Monitoring and early warning system of lake Sarez in Tajikistan. The system is built on the basis of programmable controllers S7-200, programmable controllers S7-300, PROFIBUS DP distributed periphery, field devices and operator stations, production of SIEMENS AG, INMARSAT satellite communication equipment, GPS communication equipment, meteorological station, seismic activity monitoring equipment, lake water level monitoring equipment, autonomous power supply and early warning alarm equipment. The scope of the work includes project development, specification of the equipment, mounting, programming of controllers, DP periphery, operator stations, satellite and GPS communications, application software for management, visualization and archiving development, development of two high speed continuous communication SCADA systems, start-up, commissioning, adjustment and putting in exploitation.

FELA plannungs AG - Switzerland

2007

Modernization of district heating substations LOT 1.1.4 – 36 pcs., LOT 1.1.5. – 34 pcs. and LOT 1.1.6. – 59 pcs. in Bucharest – Romania. The scope of the work includes project development, electrical and automation equipment specification, pipes and cables specification, mechanical work for the removing of the old pipes and equipment and the mounting of new ones, electrical work for the removing of the old cables and laying and connecting of new ones, equipment wiring, electrical and automation boards reconstruction, development and installation of new management software, commissioning, adjustment and putting into exploitation.

FELA plannungs AG - Switzerland

2008

Reconstruction of water purifying stations for drinking water in Kosovo. Project, development and putting into exploitation of PCS7 automation system for management and control of all the processes in the station. Тhe systems are based on SIMATIC S7 controllers, PCS7 management system, OS77 WINCC operator stations, low voltage switchgear and controlgear, production of SIEMENS AG. The scope of the work includes project development, construction work, mounting of SIMATIC S7 controllers, OS77 WINCC operator stations, low voltage switchgear and controlgear, electrical cabinets, wiring, programming, adjustment, application software development, information processing, visualization, archiving and data storing by operator stations OS77/WINCC.

Outwoods Automation Ltd. – United Kingdom

2010

Development and implementation of SCADA PCS7 system of DC Crudgington plant part of DAIRY CREST – UK and replacement of the existing Mitsubishi controllers with SIEMENS controllers. The scope of the work includes configuration and specification of the equipment, controllers and SCADA system programming, onsite start-up, commissioning and putting into exploitation.

Outwoods Automation Ltd. – United Kingdom

2010

Development and implementation of PLC/HMI management system of Butter Reworker installation in DC Crudgington plant part of DAIRY CREST – UK. The scope of the work includes configuration and specification of the equipment, controllers and HMI system programming, onsite start-up, commissioning and putting into exploitation.

PG Process Ltd. – United Kingdom

2010

Preparation of technical task and documentation for implementation of new CIP management system in BOOTS – UK. The scope of the work includes onsite investigation and preparation of technical task for the building of new CIP management system with all the necessary requirements and functionalities included.