Turn-key development and implementation of management and control system of the transport belts in buildings 402, 404 and 405 of workshop area 640 in NEOCHIM AD. The scope of the work includes equipment delivery, construction and mounting work, electrical and control boards assembly, building of optic communication network, programming of controllers, programming of network switches, programming od SCADA system, start-up, commissioning and putting into exploitation, personnel training, executive documentation preparing.
Delivery of equipment and engineering for development and implementation of management and control system of three material pumps and one mixing vessel in workshop “РЦ „Унгвенти”” on the basis of programmable controller SIMATIC ET200S IM151-8 PN/DP, production of SIEMENS AG – Germany. The scope of the work includes equipment delivery, onsite mounting and wiring of the equipment, programming of the controller, programming of the operator panels, start-up, commissioning and putting into exploitation, personnel training.
Reconstruction and certification according to module “F” of automatic conveyor belt scale weighers 08A and 08B in Coal Transport Center of TPP “Rousse – East”. The scope of the work includes project development, equipment delivery, onsite mounting and wiring of the equipment, programming of the belt scale weighers, calibration of the weighers, start-up, commissioning and putting into exploitation, personnel training, participation in control tests for certification of the weighers according to module “F” together with authorized certification laboratory.
Development, implementation and certification according to module “F” of automatic conveyor belt scale weigher of coal belt transporter 01A in TPP “Rousse – East”. The scope of the work includes project development, equipment delivery, onsite mounting and wiring of the equipment, programming of the belt scale weigher, calibration of the weigher, start-up, commissioning and putting into exploitation, personnel training, participation in control tests for certification of the weigher according to module “F” together with authorized certification laboratory.
Modernization of belt weighing scales W40201 and W40202. The scope of the work includes project development of management and control system of the weighing scales, equipment delivery, laying of cable trays and cables, onsite mounting and wiring of the equipment and distribution boards, programming of controllers, programming of operator panels, start-up, commissioning, putting into exploitation, personnel training, preparation of executive documentation.
Extending of the algorithm and the functionality of the SCADA system in workshop 700 “Power supplying” of “Neochim” AD. The scope of the work includes equipment delivery, integration into SCADA system of eight new EPMS electrometers and two pieces main power switches in Distribution substation RP-8, configuration and programming of SCADA system, development of software for calculation of the power consumption in the factory, start-up, commissioning and putting into exploitation.
Mounting and wiring of LED indicating devices for the project: “Replacement of distribution switchgear 6kV in Distribution substation 51 (РП51)”. The scope of the work includes project development, delivery of LED indicating devices, technical equipment, cables and mounting materials, board assembly, on-site mounting and wiring of board and equipment, start-up, commissioning and putting into exploitation, preparation of executive documentation
Changing of the management system of material pumps. The scope of work includes delivery of technical equipment, programming of three controllers SIMATIC S7-200 and six operator panels, on-site mounting and wiring of equipment, start-up, commissioning and putting into exploitation.
Integration of the process data from the equipment and machines in cinder processing and storage area “ISKRITCA” in TPP “Contour Global Maritza East 3” AD. The scope of work includes project development, delivery of equipment, onsite mounting and wiring of the equipment, programming of controllers, programming of SCADA system, start-up, commissioning and putting into exploitation, preparation of executive documentation.
Modernization of weighing belts W41201 and W41202, part of the technological scheme of “Phosphoric acid“ workshop of “Agropolychim” AD, Devnya. The scope of the work includes project development of belts control and management system of the belt weighing scales, equipment delivery, laying of cable trays and cables, onsite mounting and wiring of the equipment and distribution boards, programming of controllers, programming of operator panels, start-up, commissioning, putting into exploitation, personnel training, preparation of executive documentation.