RIOSV - Ruse

2014

Development and implementation of expert system for automatic measurement and reading of the water level at the two canal locks of the lake of the Nature Reserve “Srebarna” with the possibilities for measurement and reading of other water parameters according to project “Activities for stable development and management of reserve “Srebarna” and reserve “Beli Lom”, approved for financing by Operative program “Environment 2007 – 2013”. The scope of the work includes project development of the system, delivery of equipment, onsite construction and mounting work, programming of the system, onsite installation, commissioning and putting into exploitation, preparation of instruction for working with the system, personnel training, preparation of executive documentation.

“BON” EOOD

2014

Development and implementation of 5-channel batch system for seeds. The scope of the work includes project development of the system, delivery of equipment, control board assembly with equipment mounting and wiring to terminal strip, SIMATIC S7-1214 controller programming, SIMATIC HMI KTP600 operator panel programming, onsite start-up, commissioning and putting into exploitation, preparation of instruction for working with the system, personnel training, preparation of executive documentation.

“PRESTIGE 96” AD

2014

Modernization and replacement of the existing old SIEMENS SIMATIC S5 equipment for management and control of production line for biscuits “Line Punch Cookies” with contemporary equipment SIEMENS SIMATIC S7. The scope of the work includes project development, delivery of equipment, mounting and wiring of the equipment on the production line, SIMATIC ET200S controller programming, SIMATIC HMI KTP1000 operator panel programming, functional checkup, commissioning and putting into exploitation, preparation of instruction for working with the system, personnel training, preparation of executive documentation.

TPP “ROUSSE”

2014
Chemical and pharmaceutical industry

Replacement of protection system of Boiler 7. The scope of the work includes project development, delivery of equipment, onsite construction and mounting work, fail-safe controller programming, SCADA system programming, onsite commissioning, 72-hour tests, preparation of instruction for working with the system, personnel training, preparation of executive documentation.