1994 "OLIVA" LTD. - Кneja “Sunflower oil monitoring and control system”. The system is built on the basis of PLC SIMATIC S5, sunflower oil flowmeters 7MR1410 type, production of SIEMENS AG - Germany and two personal computers IBM PC/AT type. The system performs monitoring of the oil quantities in the refinery, automatic batching of small and big vessels filling at selling, making and printing of invoices, process visualization and long-term archiving of the information.
1994 "BIMAS" LTD. - Rousse Information system for vacuum measuring on the top of the rectification column. The system is built on the basis of programmable controller SIMATIC S5-95, text display ТD10 and vacuum transmitter with zener barrier, production of SIEMENS AG - Germany. It realizes vacuum monitoring on the top of the rectification column and visualization of the measured data on the display of TD10.
1994 TPP "ROUSSE" Protection system of block No4 -110MW. The system includes programmable controllers SIMATIC S5-100U, production of SIEMENS AG - Germany and operator station IBM PC/AT type. It performs automatic operation and control of the technological protection system of the boiler, activation and alarming at appearance of a critical event, and restoring of the normal working conditions after elimination of the cause for the protection system activation.
1995 "BIMAS"LTD. - Rousse Ultrasonic level monitoring system. The system is built on the basis of 10 pcs. ultrasonic transducers ST25CT, ST50UV and 10-point programmable ultrasonic station AiRanger XPL, production of MILLTRONICS - UK. The system performs monitoring and control of the level of oil products in 10 vessels and visualization of the information on the display of the ultrasonic station AiRanger XPL.
1995 "ROUSSE SHIPYARD" LTD. Cargo tanks level monitoring and control information system "CONTROL-RK" for oil tankers 621.1 hull No 528 и 529. The system is built on the basis of programmable controllers SIMATIC S5-115U and S5-103U, operator panels OP15 and operator station SICOMP, production of SIEMENS AG - Germany. The system performs monitoring and control of the level in the cargo tanks and the state of the ship engines, visualization of the information on the displays of the operator panels and on the monitor of the operator station, causing and writing of a messages for the state of the parameters monitored (pressure, temperature, etc.) and alarm messages, long-term information archiving and storing.
1996 "ORGAHIM" LTD - Rousse Ultrasonic level monitoring system. The system consists of 5 pcs. ultrasonic transducers ST25CT and 10-point programmable ultrasonic station AiRanger XPL, production of MILLTRONICS - UK and visualization software developed by SIGMA Ltd. It performs monitoring and control of the level of chemical products in 5 vessels and visualization of the measured data on the display of the ultrasonic station AiRanger XPL. AiRanger XPL is connected with personal computer, which collects, manages, visualizes, archives and stores the measured data.
1996 "ROUSSE SHIPYARD" LTD. Cargo tanks level monitoring and control information system "CONTROL-RK" for tanker 630.2 hull No 108. The system is built on the basis of programmable controllers SIMATIC S5-115U, и S5-103U, operator panels OP15 and operator station SICOMP, production of SIEMENS AG - Germany, and pressure transmitters, production of IPH - Denmark. The system performs monitoring and control of the level in the cargo tanks and the state of the ship engines, visualization of the information on the displays of the operator panels and on the monitor of the operator station, causing and writing of a messages for the state of the parameters monitored (pressure, temperature, etc.) and alarm messages, long-term information archiving and storing.
1996 "ROUSSE SHIPYARD" LTD. Cargo tanks level monitoring and control information system "CONTROL-RK" for tanker 630.2 hull No 109. The system is built on the basis of programmable controllers SIMATIC S5-115U, и S5-103U, operator panels OP15 and operator station SICOMP, production of SIEMENS AG - Germany, and pressure transmitters, production of IPH - Denmark. The system performs monitoring and control of the level in the cargo tanks and the state of the ship engines, visualization of the information on the displays of the operator panels and on the monitor of the operator station, causing and writing of a messages for the state of the parameters monitored (pressure, temperature, etc.) and alarm messages, long-term information archiving and storing.
1996 APP - Kozlodui Ultrasonic level measuring system for level monitoring of highly chemical aggressive fluids. The system consist of 10 pcs. XPS10 ultrasonic transducers and programmable ultrasonic station AiRanger XPL Plus, production of MILLTRONICS - UK.
1996 TPP "ROUSSE - EAST" Turbo-generator No2 monitoring and control automation system. The system is built on the basis of programmable controllers SIMATIC S5-95F, SIMATIC S5-135U and operator station COROS LS WIN, production of SIEMENS AG - Germany. It realizes "FAIL SAFE" automatic operation and control of the protection system of the generator by S5-95F controllers - 2 pcs. monitoring and control of the rest of the generator parameters by S5-135U controller and operation of the relevant actuating mechanisms. The whole system is managed by operator station COROS LS WIN which performs additional data processing, visualization of the monitored parameters and processes, causing and writing of operating messages, alarm messages, long-term information archiving and storing, printing of information about transition periods by key.
1996 WPP "Аntonivanovtzi" Fire alarm system, part of preventive program of “ENERGIA” insurance company. The system is built oh the basis of APOLLO fire alarm transducers and PIS24 fire alarm central unit. It performs automatic alarm signaling and logging in case of fire appearance danger.
1997 TPP "ROUSSE" Automation system for BROU (fast acting reduction and cooling device) monitoring and protection. The system is built on the basis of programmable controllers SIMATIC S7-214, production of SIEMENS AG - Germany. It automatically monitors the state and operates the action of BROU, preventing the appearance of damages. Information is reported and visualized on the monitor of the operator station of Boiler 7.
1997 Cement plant "ZLATNA PANEGA" AD - Zlatna Panega Diverter gate monitoring and control system. The system is built on the basis of programmable controller SIMATIC S5-100U, operator panel OP5, production of SIEMENS AG - Germany, SENACO Plus sensors, production of MILLTRONICS - UK and IBM PC/AT operator station. The system performs uninterrupted monitoring and control of the work of the Diverter gates. Any blocking of a gate causes alarm message appearance. The monitored parameters, processes, working messages, alarm messages are visualized on the monitor of the operator station. The operator station manages the whole system, processes, archives, stores and prints by key the information for the work of the system. A local visualization of some of the parameters on OP5 is foreseen.
1997 АGROPOLIHIM - Devnia Three ultrasonic level monitoring systems. The systems consist of 30 pcs ST25CT, ST50UV, XPS10 and XPS15 ultrasonic transducers, BICII communication module and 3 pcs. AiRanger XPL Plus programmable ultrasonic station with relay output modules SAM-20, production of MILLTRONICS - UK. They perform uninterrupted monitoring of the level in 30 vessels. At reaching of a fixed pre-set level values the systems automatically switch on/off pumps and operate the filling/empting of the vessels.
1997 "STORKO" - PLeven Automation system for monitoring and control of stork and temperature monitoring in 3 autoclaves. The system is built on the basis of programmable controller SIMATIC S5-100U, operator panel OP5, production of SIEMENS AG - Germany, pressure transmitters and differential pressure transmitters, production of ESI - UK and IBM PC/AT operator station. It performs automatically operation of the work of the stork by uninterrupted monitoring and holding up of a fixed pressure and differential pressure and the work of the autoclaves by keeping a constant pre-set temperature. The system is managed by operator station for information visualization, archiving, storing and printing by key.
1997 "DELVI-P" LTD. - Varna Ice cream mixture level, volume and temperature monitoring system. The system is built on the basis of programmable controller SIMATIC S5-102U, production of SIEMENS AG - Germany, 20 pcs. ST25CV ultrasonic transducers, 2 pcs. AiRanger XPL Plus ultrasonic stations, production of MILLTRONICS - UK, 20 pcs. Pt100 sensors and 2 pcs. IBM PC/AT operator stations. It performs uninterrupted monitoring and control of the temperature, the level and the volume of ice cream mixtures in 20 vessels by keeping of the optimum conditions for the preparing of the mixtures. The information for the work of the system is visualized, managed archived and stored by the two operator stations.
1998 TPP "ANTIBIOTIC" LTD - Razgrad Reconstruction of Boiler No 6. Complete replacement of the existing relay-contactor wiring with new automation system. The reconstruction is performed on the basis of programmable controllers SIMATIC S5-95F, SIMATIC S5-115U, and ОS77/WINCC operator station, production of SIEMENS AG - Germany, UV burner flame control sensors, production of Honeywell - USA и gas regulators of GASTECHNIKA company. The system realizes automatic operation and control of the fuel burning installation, natural gas supplying and "FAIL SAFE" protection system, visualization of the necessary parameters and processes by operator station, processing, long-term archiving, storing and printing by key of the information.
1998 BLACKBURN STARLING Ltd. – United Kingdom Start-up, commissioning, adjustment and putting in exploitation of centrifugal moulding plant in Teheran – Iran. The scope of the work includes start-up and adjustment of the field devices, programming, start-up, commissioning and adjustment of the Allen Bradley controllers and SCADA system, personnel training.
1998/
1999
TPP "ROUSSE" Fire alarm system of TPP "ROOSSE - EAST". The system is built on the basis of automatic fire alarm sensors APOLLO, TESLA, Protectorwire, central units PIS24 - 5 pcs., PIS8 - 1 pc., ELTA telephone exchange and IBM PC/AT computer.
1999 TPP "ANTIBIOTIC" LTD - Razgrad Reconstruction of Boiler No 5. Complete replacement of the existing relay-contactor wiring with new automation system. The reconstruction is performed on the basis of programmable controllers SIMATIC S5-95F, SIMATIC S5-115U, and ОS77/WINCC operator station, production of SIEMENS AG - Germany, UV burner flame control sensors, production of Honeywell - USA и gas regulators of GASTECHNIKA company. The system realizes automatic operation and control of the fuel burning installation, natural gas supplying and "FAIL SAFE" protection system, visualization of the necessary parameters and processes by operator station, processing, long-term archiving, storing and printing by key of the information.
1999 "DEVNYA CEMENT" - Devnia Cooler monitoring and control system for cement furnace No 6 with IKN fans. The system is built on the basis of programmable controller SIMATIC S7-315 DP and OS77/WINCC operator station, production of SIEMENS AG - Germany. It performs automatic management and control of the work of all systems of the cooler including monitoring of the necessary parameters and processes, and operation of the actuating mechanisms. The whole information is processed, visualized, archived and stored by the operator station OS77/WINCC.
1999 APP - Kozlodui Ultrasonic level measuring system for level monitoring of highly chemical aggressive fluids. The system consists of 10 pcs. XPS10 ultrasonic transducers and programmable 10-point ultrasonic station AiRanger XPL Plus, production of MILLTRONICS - UK. It performs uninterrupted monitoring of the level of highly chemical aggressive fluids in 10 vessels and visualization of the information on the display of AiRanger XPL Plus.
1999 TPP "ROUSSE - EAST" "Automatic monitoring of fuel burning installation of block No2". The system is built on the basis of programmable controller SIMATIC S7-314 and operator station OS77/WINCC, production of SIEMENS - Germany. The system performs automatic monitoring and control of the fuel installation and the burning of block No2 and information processing, visualization, archiving and storing of the necessary parameters, states, working and alarm messages by the operator station as well as printing by key of selected information from previous periods.
1999 TPP "ROUSSE - EAST" "Block No 4 FAIL SAFE protection system". The system is built on the basis of programmable controllers SIMATIC S5-95F and operator station OS77/WINCC, production of SIEMENS - Germany. The system performs automatic monitoring and control of block No2 protections and information processing, visualization, archiving and storing in operator station.
1999 TPP "ROUSSE - EAST" Reconstruction of Boiler 8. Includes construction work, replacement of the whole existing relay - contactor wiring with automation system built on the basis of SIMATIC S5 and S7 controllers, production of SIEMENS - Germany, cabling, delivery and mounting of sensors, transmitters, SIMATIC S5 and S7 controllers, electrical cabinets RITTAL and operator stations OS77/WINCC, developing and implementation of application software for visualization, archiving and storing of the information. The new automation systems realizes total management and control of the boiler, including automatic operation of "FAIL SAFE" protection system, fuel and burning installation, automatic management of the whole boiler by building of redundant optical communication ring, input in the system and automatic monitoring of all boiler measurements (pressure, temperature, flow, etc.).
2000 TPP "Maritza East 2" Automatic monitoring of fuel burning installation and control system of Turbo-generator No 9. The system includes 4 pcs. SIMATIC S7-215 controllers for burner control of 8 burners, SIMATIC S7 315-2DP controller for general fuel burning system control and operator station OS77/WINCC for process visualization, data processing, long-term archiving and storing of the information. All the equipment is production of SIEMENS - Germany. The system realizes automatic management of the fuel burning installation, information processing, visualization, archiving and storing by operator station OS77/WINCC.
2000 TPP "ROUSSE - EAST" Reconstruction of protection system of steam generator No 5. Includes full replacement of relay - contactor wiring and development of "FAIL SAFE" protection system. The new "FAIL SAFE" system is built on the basis of SIMATIC S5-95F controllers and low-voltage switchgear and controlgear, production of SIEMENS - Germany, IR flame control sensors, production of Honeywell - USA, PC based operator station and application software developed by SIGMA Ltd. The system realizes automatic management of the boiler protection systems, visualization, data processing, archiving and storing of the information in operator station.
2000 "ZVEZDA" Ltd. - D. Mitropoliya "Sunflower oil monitoring and control system" for monitoring of oil production and selling. The system is built on the basis of 7MR1410 flowmeters, SIMATIC S7-214 controllers, production of SIEMENS - Germany and PC based operator station. It performs automatic pump start/stop during sunflower oil transport, monitoring and control of oil quantity in storage vessels, automatic calculation of the sold oil quantity during the filling of small and big vessels, invoice printing, process information visualization, archiving and storing in operator station.
2000 /
2001
TPP "ROUSSE - EAST" Reconstruction of protection system of steam generator No 7 and reconstruction of ROU (reducing and cooling installation). Includes full replacement of relay - contactor wiring and development of "FAIL SAFE" protection system on the basis of SIMATIC S5-95F controllers and low-voltage switchgear and controlgear, production of SIEMENS - Germany, IR flame control sensors, production of Honeywell - USA, PC based operator station, S7-OPC server and application software developed by SIGMA Ltd. ROU reconstruction is based on SIMATIC S7-224 controller connected with the operator station of the protection system of Boiler No 7. The system realizes automatic management of boiler protection system and ROU, data visualization, processing, archiving and storing in operator station with S7-OPC server.
2000 /
2001
SOLVAY SODI AD - Devnya Project, design and development of management automation system for three ventilator towers, 9 ventilators each. The system is built on the basis of programmable controllers S7-215 and operator panels OP17, terminals, terminal blocks, low-voltage switchgear and controlgear, production of SIEMENS - Germany, and RITTAL enclosures for the equipment. The system performs operation and control of the work of three groups of ventilators according to fixed, individual algorithms. Information for the work of the system is visualized on the displays of the operator panels. By OP17 a change in the existing and adding of new parameters is performed. Also a possibility for connection to plant LAN is foreseen.
2000 /
2001
TPP "ROUSSE - EAST" Reconstruction of Chemical Water Treatment Department. The system realizes intelligent low-level network communication by using of SIEMENS ASI interface and complete automatic control of sensors, actuators, pumps etc. It monitors and visualizes on OS77/WINCC operator station all the necessary process parameters like pressure, level, volume, temperature etc., performs data processing, archiving and storing of the information for the work of the department. The automation equipment includes ASI communication modules, ASI actuators, ASI motor starters, SITRANS FM electromagnetic flowmeter, SIMATIC S7 315-2-DP controller, OS77/WINCC operator station, AiRanger XPL Plus ultrasonic level station - 2 pcs., AiRanger DPL Plus ultrasonic station. The application software is developed by SIGMA Ltd. The system performs total monitoring, management and visualization of the processes in Chemical Water Treatment Department as well as long-term archiving and storing of the information.
2001 TPP "Maritza East 2" Automatic monitoring of fuel burning installation and control system of Turbo-generator No 10. The system includes 4 pcs. SIMATIC S7-215 controllers for burner control of 8 burners, SIMATIC S7 315-2DP controller for general fuel burning system control and operator station OS77/WINCC for process visualization, data processing, long-term archiving and storing of the information. All the equipment is production of SIEMENS - Germany. The system realizes automatic management of the fuel burning installation, information processing, visualization, archiving and storing by operator station OS77/WINCC.
2001 SOLVAY SODI AD - Devnya Project, development and putting into exploitation of automation system for management of palletizing installation for soda bags. The system is built on the basis of programmable controller S7-314 with ASI communication interface, operator panel OP17, ASI input-output modules, buttons and low-voltage switchgear and controlgear, production of SIEMENS - Germany. It realizes total management and control of the palletizing installation from the moment of the bags entering to the moment of the finished palette going out. Intelligent low-level ASI communication is used. Information for the work of the system is visualized and operated by OP17, from which the whole system is managed.
2001 Balkanpharma - Razgrad AD Project, development and putting into exploitation of automation system for operation of air ventilators, smoke ventilators and supply water pumps and connection of the system to the existing management systems of Boilers 5 and 6. The system is built on the basis of programmable controller S7-226, digital indicators, differential pressure transmitters SITRANS DS III and frequency inverters MIDIMASTER ECO, productions of SIEMENS - Germany. It realizes total operation and control of the ventilators and supply water pumps according to the work and management of the boilers. The motors of the smoke ventilators (100 KW), air ventilators (110 KW) and water supply pumps (200 KW) are managed by the frequency inverters which ensure the optimum operation mode. The information from the inverters is collected and processed by S7-226 controller, which realizes general control and management algorithms and the connection with the existing management systems of Boilers 5 and 6.
2001 TPP "Maritza East 3" Automatic monitoring of fuel burning installation and control system of Boiler No 2. The system includes 4 pcs. SIMATIC S7-215 controllers for burner control of 8 burners, SIMATIC S7 315-2DP controller for general fuel burning system control and operator station OS77/WINCC for process visualization, data processing, long-term archiving and storing of the information. All the equipment is production of SIEMENS - Germany. The system realizes automatic management of the fuel burning installation, information processing, visualization, archiving and storing by operator station OS77/WINCC.
2001 Balkanpharma - Razgrad AD Project, development and putting into exploitation of automation system for operation of 14 motors of agitators of fermentation vessels. The system is built on the basis of frequency inverters for operation of 75KW motors MIDIMASTER VECTOR type, production of SIEMENS - Germany. Each inverter is programmed to ensure the optimum operation mode of the relevant motor. Information for the work of the inverters (motors) entered in the existing TDC300 Honeywell system, programmed by SIGMA Ltd. to work with the MIDIMASTER VECTOR inverters.
2001 SOLVAY SODY AD - Devnya Reconstruction of palletizing installation for soda bags. Includes development of contemporary management algorithms and new application management software programming and adjustment.
2001 Balkanpharma Dupnitza AD Project, development and putting into exploitation of video monitoring system for blisters. The system is built on the basis of V710 digital camera and SIMATIC C7 controller, production of SIEMENS AG. The scope of the work includes project, delivery, mounting and wiring of V710 digital camera and SIMATIC C7 controller, programming, visualization software development, start up, adjustment, and putting into exploitation. The system performs video monitoring of blisters with pills, detection and information about the presence of broken or missing pills.
2001 Balkanpharma Dupnitza AD Technical evaluation, information analysis and project development of system for monitoring and management of the energy resources by sites in Balkanpharma Dupnitza” AD. Realization of the I STAGE – monitoring of the energy flows and evaluation of the consumption. The scope of the work includes project development of the system, mounting and parameterization of power meters, development of the evaluation software for energy consumption.
2001 Balkanpharma – Razgrad AD Automation of TPP to Balkanpharma – Razgrad AD – second stage. Technical evaluation, information analysis and project development of automaton system for optimum control and effective management of the steam flows.
2001/
2002
FELA plannungs AG - Switzerland Reconstruction and rehabilitation of 3 water purifying stations for drinking water in Kosovo. Project, development and putting into exploitation of PCS7 automation systems for management and control of all the processes in each station. The systems include project, construction work, mounting of SIMATIC S7 controllers, OS77 WINCC operator stations, low voltage switchgear and controlgear, electrical cabinets, wiring, programming, adjustment, application software development, information processing, visualization, archiving and storing by operator stations OS77/WINCC.
2002 Targoviste Bottling Company OOD Management and control system of the work of plastic bottles blast machine. The system is built on the basis of SIMATIC S7-314 programmable controller and SIPART DR19 controller, production of SIEMENS AG. It replaces the old inefficient management system. The scope of the work includes project, delivery, mounting and wiring of SIMATIC S7-314 and SIPART DR19 controllers, programming, adjustment and putting into exploitation. The system performs automatic management and control of the work of the blast machine.
2002 KCM – Plovdiv
Project Manager – MAROBENI - Japan
Development, programming, adjustment and putting into exploitation of substation control and management system based on SICAM SAS energy monitoring system, production of SIEMENS AG. The system performs remote monitoring of the position and parameters of all the inputs and outputs of the sectional circuit-breakers. It realizes collecting and analysis of the actions of each of the SIPROTEC microprocessor protection devices, reading and balance of the supplied and consummated electrical energy by tariffs. The system works in real time with clock synchronization by DCF.
2002 FELA plannungs AG - Switzerland Automation system for management and control of the dam locks in Jablanica, Kosovo. The system is built on the basis of SIEMENS equipment and realizes total management and control of the work of the dam locks both in automatic and hand-operated modes.
2003 COCA COLA HELENIC BOTLLING COMPANY Ltd. Project, delivery, mounting, wiring, programming, start-up, commissioning and putting in exploitation of automation systems for two carbon dioxide dozing and soft drinks carbonate machines. The system is built on the basis of field devices, programmable controllers S7226 XM and Touch panels TP070 5.7", production of SIEMENS AG. They realize automatic monitoring and control of the carbon dioxide dozing and soft drinks carbonating.
2003 TPP “ROUSSE” Automation system for management, monitoring and dozing of the coal-feeding to the boilers in TPP “Rousse - East”. The system is built on the basis of programmable controller SLOT PLC 412 with distributed ASI periphery, intelligent field devices (sensors and transmitters) with ASI communication, belts scales for continuous in-line weighing and operator station for management, visualization and information archiving, production of SIEMENS AG. It realizes automatic management, monitoring and dozing of the coals quantity supplied to the boilers for the ensuring of the optimum working conditions. The scope of the work includes project, specification of the equipment, delivery, programming, application software for management visualization and archiving development, start-up, commissioning, adjustment and putting in exploitation.
2003 TPP “ROUSSE” Automation system for technological protection of Turbo-generator 5 in TPP “Rousse - East”. The system is built on the basis of programmable redundant controllers S7-315F and operator station, production of SIEMENS AG. It realizes total automatic control of the technological protection and block system of the Turbo-generator together with information visualization and long term archiving. The scope of the work includes project, specification of the equipment, delivery, mounting, wiring, programming, application software for management visualization and archiving development, start-up, commissioning, adjustment and putting in exploitation.
2003 VARSA SHIPING LTD. Modernization of the pump department of tanker “Yaroslav Hashek”. The scope of the work includes project, development, mounting, IP66 control board assembly, wiring, programming, commissioning, adjustment and putting into exploitation of automation system for temperature, level and hydrocarbons vapor monitoring and alarm signaling. The system is built on the basis of logical module LOGO 12/24RC, production of SIEMENS AG – Germany and EX zone level transmitters, Pt100 sensors and gas detectors. It has self –diagnostic mode and works fully automatically, which ensures complete reliability.
2003 VARSA SHIPING LTD. Modernization of the pump department of tanker 630.2 hull 108. The scope of the work includes project, development, mounting, IP 66 control board assembly, wiring, programming, commissioning, adjustment and putting into exploitation of automation system for temperature, level and hydrocarbons vapor monitoring and alarm signaling. The system is built on the basis of logical module LOGO 12/24RC, production of SIEMENS AG – Germany and EX zone level transmitters, Pt100 sensors and gas detectors. It has self –diagnostic mode and works fully automatically, which ensures complete reliability.
2003 /
2004
UMICORE MED AD Waste water treatment plant management system. The system is built on the basis of PCS7 automation system of SIEMENS AG. It includes distributed periphery ET200M, intelligent field devices, programmable controllers S7-400, PROFIBUS DP communication and operator stations. The scope of the work includes project, specification of the equipment, programming, application software for management visualization and archiving development, start-up, commissioning, adjustment and putting in exploitation.
2003 /
2004
FELA plannungs AG - Switzerland Monitoring and early warning system of lake Sarez in Tajikistan. The system is built on the basis of programmable controllers S7-200, programmable controllers S7-300, PROFIBUS DP distributed periphery, field devices and operator stations, production of SIEMENS AG, INMARSAT satellite communication equipment, GPS communication equipment, meteorological station, seismic activity monitoring equipment, lake water level monitoring equipment, autonomous power supply and early warning alarm equipment. The scope of the work includes project development, specification of the equipment, mounting, programming of controllers, DP periphery, operator stations, satellite and GPS communications, application software for management, visualization and archiving development, development of two high speed continuous communication SCADA systems, start-up, commissioning, adjustment and putting in exploitation.
2004 TPP “ROUSSE” Automation system for technological protection of Turbo-generator 6 in TPP “Rousse - East”. The system is built on the basis of programmable redundant controllers S7-315F and operator station, production of SIEMENS AG. It realizes total automatic control of the technological protection and block system of the Turbo-generator together with information visualization and long term archiving. The scope of the work includes project, specification of the equipment, delivery, mounting, wiring, programming, application software for management visualization and archiving development, start-up, commissioning, adjustment and putting in exploitation.
2004 VARSA SHIPING LTD. Modernization of the pump department of tanker 630.3 hull 109. The scope of the work includes project, development, mounting, IP 66 control board assembly, wiring, programming, commissioning, adjustment and putting into exploitation of automation system for temperature, level and hydrocarbons vapor monitoring and alarm signaling. The system is built on the basis of programmable controller SIMATIC S7-200, production of SIEMENS AG – Germany and EX zone level transmitters, Pt100 sensors and gas detectors. It has self –diagnostic mode and works fully automatically, which ensures complete reliability.
2004 SVILOSA AD Project development of system for monitoring, control and management of Cellulose Drying Machine. The work on the project includes complete project development – Electrical Part and Automation Part, and specification of all the control, drive and field equipment.
2005 Energorazpredelenie AD - Razgrad Monitoring, control and visualization system of VC “ Centre” – Razgrad. The system is built on the basis of SICAM SAS energy monitoring system, production of SIEMENS AG and radio-modems, production of RACOM – Czech Republic. It performs automatic energy monitoring and management of the necessary substations, information transfer via radio channel, data processing, visualization and archiving on operator station. The scope of the work includes project development, mounting, programming, commissioning, adjustment and putting into exploitation.
2005 CUMERIO MED AD Complete turn-key automation system for management, monitoring and control of Converter Spray Chamber No 2 in Metallurgical Department. The system is based on SIMOCODE PRO motor control units and PCS7 automation system, production of SIEMENS AG. It realizes total management and control of all the processes in the Converter Spray Chamber. The scope of the work includes project development, demolition of the existing equipment, mounting of new equipment, cables and cable trays laying, panel assembly, programming, commissioning, adjustment and putting into exploitation.
2005 SOLVAY SODY AD Automation system for management and control of Anthracite Screening and Crushing Installation. The system I s built on the basis of ET200S distributed control periphery, SIMOCODE PRO motor control units, production of SIEMENS AG. It realizes automatic management of the installation with all necessary for the correct work signal processing and information transfer to upper level controller TDC3000 of HONEYWELL for additional data processing visualization and archiving. The scope of the work includes project development, control board assembly, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 VARSA SHIPING LTD. Reconstruction and repairing of monitoring and control information system “CONTROL – M” of tanker “Saratov City”. The scope of the work includes on-site diagnostic of the system, project development, specification of the necessary equipment, programming, commissioning, adjustment and putting into exploitation.
2005 VARSA SHIPING LTD. Modernization of the pump department of tanker “Saratov City”. The scope of the work includes project, development, mounting, IP 66 control board assembly, wiring, programming, commissioning, adjustment and putting into exploitation of automation system for temperature, level and hydrocarbons vapor monitoring and alarm signaling. The system is built on the basis of programmable controller SIMATIC S7-200, production of SIEMENS AG – Germany and EX zone level transmitters, Pt100 sensors and gas detectors. It has self –diagnostic mode and works fully automatically, which ensures complete reliability.
2005 SALS AD - Devnya Automation system for monitoring, management and control of 4 conveyor belts for soda transportation from SALS AD to port “VARNA – ZAPAD” with mutual interlocks. The system is built on the basis of redundant programmable controllers SIMATIC S7 315-2DP with distributed periphery ET200M, local operator panel OP7, production of SIEMENS AG – Germany and operator station. It performs automatic management and control of the work of the belt conveyors. The work on the system includes project development, delivery of the equipment, assembly of two control boards, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 AGROPOLYCHIM JSC Automation system for monitoring, management and control of 4 conveyor belts in store area of to port “VARNA – ZAPAD”. The system is built on the basis of programmable controllers SIMATIC S7-314 and SIMATIC S7-312, production of SIEMENS AG – Germany. It performs automatic management and control of the work of the belt conveyors during store supplying and ship loading. The work on the system includes project development, delivery of the equipment, assembly of two control boards, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 NEK EAD Delivery and mounting of 10 pcs. flowmeters for measurement of water quantities in open channels, ref. № ТС 2451047. The scope of the work includes delivery, onsite mounting, programming, commissioning, adjustment and putting into exploitation of 10 pcs. open channel flowmeters OCMIII, production of SIEMENS AG – Germany for dam areas “Chaira”, “Belmeken” and “Rhodopa”. It is realized constant measurement and monitoring of the water stands and quantities in the relevant measurement points and information transmission by GSM to the computers in the administration buildings of each dam area. Independently of this the data in each measurement point are recorded and stored in the flowmeter memory, from where they are downloaded at certain periods of time with hand-held computer.
2005 BALKANPHARMA TROYAN AD Replacement of the management and control system of dozing machine. The new system is built on the basis of programmable controller SIMATIC S7 312, production of SIEMENS AG – Germany. The scope of the work includes equipment specification, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 CARLSBERG BULGARIA AD Buffer vessel management and control automation system. The system is built on the basis of programmable controller SIMATIC S7 315-2DP and operator panel OP7, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 CARLSBERG BULGARIA AD Replacement of the management and control system of CIP of glass bottles bottling line. The new system is built on the basis of programmable controller SIMATIC S7 314, operator panel OP77B, production of SIEMENS AG – Germany and pneumatic equipment, production of Bosch Rexroth. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation. The system automatic and manual management and control of CIP of the bottling line.
2005 PROVADSOL AD Management and control system of brine pump. The system is built on the basis of programmable controller SIMATIC S7 313С-2DP and operator panel ТP270, The scope of the work includes equipment specification, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 SPARKY AD - Rousse Management and control system of multi-purposed machine. The system is built on the basis of programmable controller SIMATIC S7 314С-2DP and operator panel ОP77А, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 SVILOSA AD Assembly of power substation main boards according to project for Cellulose Water Removing and Drying Machine. The scope of the work includes assembly, onsite mounting, commissioning and adjustment of PRIZMA main boards and busbar system on the basis of equipment of Schneider Electric company.
2005 TPP “ROUSSE” Automation system for technological protection of Steam Generator 7, Turbo Generator 5 and Turbo Generator 6. The system is built on the basis of programmable controller SIMATIC S7 315F-2DP, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2005 VARSA SHIPING LTD. Modernization of the pump department of tanker “Volgotanker”. The system is built on the basis of programmable controller SIMATIC S7 200, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation. The system performs automatic pump management and control, monitoring of temperatures, levels, flammable hydrocarbons vapor concentration as well as sound and light alarm signaling.
2006 NEK EAD Delivery, mounting and putting into exploitation of two open channel flowmeters for measurement of water quantities in the range 0 - 25 m3/s and 0 - 5 m3/s. The scope of the work includes delivery, programming, mounting, commissioning, adjustment and putting into exploitation of two open channel flowmeters OCM EM, production of NIVUS GMBH – Germany for dam area “Rozov kladenetz”. It is realized constant measurement and monitoring of the water stands and quantities in the relevant measurement points and information transmission by GSM to the computers in the administration building of the dam area. Independently of this the data in each measurement point are recorded and stored in the flowmeter memory, from where they are downloaded at certain periods of time with hand-held computer.
2006 TPP “ROUSSE” Replacement of regulator of Multiple Thermal Heating Substation. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation of new regulator on the basis of programmable controller SIMATIC S7 314C-2 PTP and operator panel OP77A, production of SIEMENS AG – Germany. The system and the regulator realize management, monitoring and control of the input and output signals, and executive devices, information processing and visualization.
2006 BALKANPHARMA TROYAN AD Replacement of the management and control system of palletizing robot. The new system is built on the basis of programmable controller SIMATIC S7 313C, production of SIEMENS AG – Germany. The scope of the work includes equipment specification, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2006 DUNARIT AD Management and control system of galvanization line. The system is built on the basis of programmable controllers SIMATIC S7 314, SIMATIC S7 226 and operator “Touch” panel TP177A, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, boards assembly, mounting, wiring, programming, commissioning, adjustment and putting into exploitation
2006 NEOCHIM AD Project development of new Energy Monitoring SCADA Automation system for replacement of the old existing MIK – 2000 system. The scope of the work includes complete project development – topological diagrams, line diagrams, wiring diagrams, electrical and automation board layouts, cable list, equipment specification.
2006 PROVADSOL AD Extension of Plant Scape System of Honeywell – I stage. The extension is built on the basis of distributed periphery controller ET200S, production of SIEMENS AG – Germany. The scope of the work includes project development, equipment delivery, board assembly, programming, commissioning, adjustment and putting into exploitation.
2006 PROVADSOL AD Extension of Plant Scape System of Honeywell – II stage. The extension is built on the basis of distributed periphery controller ET200S, production of SIEMENS AG – Germany. The scope of the work includes project development, equipment delivery, board assembly, programming, commissioning, adjustment and putting into exploitation.
2006 SOLVAY SODY AD Automation of installation for heavy loose soda – includes building of management, control and visualization system on the basis of programmable controller SIMATIC S7 313C-2DP and operator “Touch” panel TP170A, production of SIEMENS AG – Germany. The scope of the work includes project development, equipment delivery, control board assembly, programming, commissioning, adjustment and putting into exploitation.
2006 TPP “ROUSSE” Project development - Electrical and Automation parts for Chemical Water Treatment department: “Neutralization reservoir”, “Water treatment of alkaline water with mechanical admixtures and second use”, Reconstruction of the separation system and additional purifying of oiled water”. The scope of the work on the projects includes topological diagrams, line diagrams, wiring diagrams, electrical and automation board layouts, cable list, equipment specification.
2006 TPP “ROUSSE” Microprocessor system for analogue values archiving and data transmission to the operator station of the Fuel Burning Installation Monitoring and Control System of Steam Generator 2 in TPP”Rousse”. The system is built on the basis of programmable controller SIMATIC S7300, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2006 TPP “ROUSSE” Reconstruction of SCADA Automation System of Boiler 5 in TPP”Rousse”. The reconstruction includes Technological protection system of K5 – built on the basis of programmable controller SIMATIC S5 95F, production of SIEMENS AG – Germany, management and control system of the Natural Gas Burning Installation – built on the basis of programmable controller SIMATIC S7 300F, production of SIEMENS AG – Germany and Dust Feeders Control system – built on the basis of frequency inverters MICROMASTER 420, production of SIEMENS AG – Germany. The existing management and visualization software installed on the two operator stations and one engineering station is replaced with WINCC V6.0 SP4 system software, production of SIEMENS AG – Germany. The scope of the work includes project development, delivery of the equipment, mounting, wiring, PLC and SCADA programming, application software development, commissioning, adjustment and putting into exploitation.
2007 NEOCHIM AD Building of new Energy monitoring and control SCADA automation system and replacement of the existing old MIK – 2000 system. The system is built on the basis of programmable controllers SIMATIC S7 315-2PN/DP, distributed periphery ET200S, SICAM PAS management system for control of power distribution substations and operator stations, production of SIEMENS AG – Germany, power meters PM130Е and ezPAC, production of SATEC Ltd. – Italy, optical switches and converters, production of RUGGEDCOM – Canada, digital energymeters, production of MPS Ltd. – Bulgaria, and meteorological station, production of ADOLF THIES GmbH – Gerrmany. The scope of the work includes equipment delivery, building of optical Ethernet network, electrical and automation boards assembly, onsite mounting of boards and field equipment, wiring, building of cable roads, cable laying, PLC and SCADA programming, application software development, commissioning, adjustment and putting into exploitation.
2007 KAOLIN AD Automation system for measurement and automatic batching of 20t CaCO3 (fractions 0.1 – 2.0 mm) into cistern cars in IGNATIEVO factory. The system is built on the basis of programmable controller SIMATIC S7 315-2DP, conveyor belt scale MSI and operator station, production of SIEMENS AG – Germany, and ultrasonic transducers, production of PULSAR Ltd. – UK. The scope of the work includes project development, delivery of the equipment, automation board assembly, mounting, wiring, programming, commissioning, adjustment and putting into exploitation.
2007 ILINDEN AD Management and control system of six Die-casting machines for MONTUPET – France. The scope of the work includes delivery of automation equipment, electrical boards, cables, transmitters and electrical materials according to the project of MONTUPET, electrical boards assembly, onsite mounting, cabling, commissioning, adjustment and putting into exploitation.
2007 FICOSOTA SYNTEZ AD Dismantling, transportation, mounting, commissioning, adjustment and putting into exploitation of conveyor line for sanitary pads and pampers. The scope of the work includes taking the line into pieces, conservation, packing and transportation to FICOSOTA SYNTEZ AD, onsite mounting and cabling, commissioning, adjustment and putting into exploitation.
2007 FELA plannungs AG - Switzerland Modernization of district heating substations LOT 1.1.4 – 36 pcs., LOT 1.1.5. – 34 pcs. and LOT 1.1.6. – 59 pcs. in Bucharest – Romania. The scope of the work includes project development, electrical and automation equipment specification, pipes and cables specification, mechanical work for the removing of the old pipes and equipment and the mounting of new ones, electrical work for the removing of the old cables and laying and connecting of new ones, equipment wiring, electrical and automation boards reconstruction, development and installation of new management software, commissioning, adjustment and putting into exploitation.
2007 KCM AD - Plovdiv Extension of energy monitoring SCADA system SICAM SC, production of SIEMENS AG – Germany. The scope of the work includes replacement of two existing operator stations with modern ones and adding of new operator station, realization of redundant management and control of the operator stations, SCADA software reinstall, commissioning, adjustment and putting into exploitation.
2007 SVILOTSEL EAD Project development for reconstruction and modernization of Cellulose Manufacturing Department in SVILOTSEL EAD – Svistov, Electrical and Automation parts. The scope of the work includes preliminary onsite examination and development of topological diagrams, line diagrams, electrical and automation boards layouts, explanatory note, cable list and equipment list.
2007 SVILOTSEL EAD Project development of Raw Materials Preparation Department in SVILOTSEL EAD – Svistov, Electrical and Automation parts. The scope of the work includes preliminary onsite examination and development of topological diagrams, line diagrams, electrical and automation boards layouts, explanatory note, cable list and equipment list.
2007 SOLVAY SODY AD Project development and assembly of electrical and automation board with ET200S station for power supply and management of different consumers. The scope of the work includes project development, board delivery, board assembly, commissioning, adjustment and putting into exploitation.
2007 SOLVAY SODY AD Project development for the replacement of relay and contactor control system of the technological process in Devnya Varovik AD. The scope of the work includes preliminary onsite examination, reconstruction of the 6kV power supply diagram in Rough Crusher, reconstruction of the 0.4kV power supply diagram in Substation 3 - Rough Crusher, reconstruction of the 0.4kV power supply diagram in Substations 1 and 1A - Fine Crusher, topological diagrams, line diagrams, electrical and construction diagrams of the equipment mounting and the electrical connections, electrical and automation boards layouts, explanatory note, cable list and equipment list.
2007 TPP “ROUSSE” PLC software development for the management of projects “Neutralization reservoir” and “ Water treatment of alkaline water with mechanical admixtures and second use” in Chemical Water Treatment Department
2008 SOLVAY SODY AD Station “Gasilen” project development in Lime department, Automation part. The scope of the work includes preliminary on-site investigation and working project development.
2008 DEVEN AD Project development and implementation of management and control system for Crusher and CFBB. The scope of the work includes preliminary on-site investigation, management system working project development, electrical and control boards assembly, commissioning, adjustment and putting into exploitation.
2008 SOLVAY SODY AD Reconstruction of ET200 control boards for management of Lime furnaces. The scope of the work includes dismantling of the existing equipment, mounting and wiring of new equipment, commissioning, adjustment and putting into exploitation.
2008 TPP “ROUSSE” Changing of algorithms for cooling fans management and control. The scope of the work includes application software for cooling fans development and implementation.
2008 NEOCHIM AD Project development for “Automation of steam installation management system” – Electrical and Automation parts. The scope of the work includes preliminary on-site investigation and working project development.
2008 SOLVAY SODY AD Fan tower C interface connection development. The scope of the work includes delivery of equipment, communication software for remote management development and implementation, commissioning, adjustment and putting into exploitation of frequency inverters and management system.
2008 SOLVAY SODY AD Heavy soda processing line project development, Automation part. The scope of the work includes preliminary on-site investigation and working project development.
2008 NEOCHIM AD Project development for “Replacement of belt junction management system in workshop 640, frames 402, 404 and 405”, Electrical and Automation parts. The scope of the work includes preliminary on-site investigation and working project development.
2008 NEOCHIM AD Project development for “Mounting and implementation of softstarter for soft start of pumps motors 6kV of pumping station “Maritza””. The scope of the work includes preliminary on-site investigation and working project development.
2008 ASTRA BIOPLANT AD Automation of “Extraction” workshop. The scope of the work includes controller Fanuc CPU310 and SCADA systems, commissioning, adjustment and putting into exploitation.
2008 SOLVAY SODY AD Development and implementation of management software for 14 AC motors in Large Crushing Frame. The scope of the work includes application software development, commissioning, adjustment and putting into exploitation.
2008 HONEYWELL BULGARIA Project development and implementation of management system of “Ammonia” workshop in NEOCHIM AD, Automation part. The scope of the work includes working project development, application software development and implementation, data base creation and implementation, commissioning, adjustment and putting into exploitation.
2008 KPZ AD Development and implementation of furnaces C3 and C5 management systems. The scope of the work includes working project development, delivery of equipment, control boards assembly, on-site mounting and wiring of control boards and equipment, programming, commissioning, adjustment and putting into exploitation.
2008 FAZERLES AD Delivery, mounting, programming and putting into exploitation of frequency inverters MICROMASTER 420, MICROMASTER 430 and MICTROMASTER 440, production of SIEMENS AG – Germany.
2008 NEOCHIM AD Extension of SCADA system, communicational connection of the new MKTP66 transformer station to the existing SCADA system of workshop 700. The scope of the work includes delivery of equipment, control board assembly, programming, commissioning, adjustment and putting into exploitation.
2008 FELA plannungs AG - Switzerland Reconstruction of water purifying stations for drinking water in Kosovo. Project, development and putting into exploitation of PCS7 automation system for management and control of all the processes in the station. Тhe systems are based on SIMATIC S7 controllers, PCS7 management system, OS77 WINCC operator stations, low voltage switchgear and controlgear, production of SIEMENS AG. The scope of the work includes project development, construction work, mounting of SIMATIC S7 controllers, OS77 WINCC operator stations, low voltage switchgear and controlgear, electrical cabinets, wiring, programming, adjustment, application software development, information processing, visualization, archiving and data storing by operator stations OS77/WINCC.
2008 SIEMENS EOOD Performance of electrical installations (appliances) part: “Low voltage electrical installations of MALL VARNA”. The scope of the work includes cable laying and wiring, mounting and wiring of all the electrical devices, start-up, commissioning and putting into exploitation of all the low voltage electrical installations.
2009 “TPP VARNA” EAD Project development, specification, delivery, mounting wiring and putting into exploitation of 2 pcs. regulators for excitation of the DC motors 6KV of the mills of Block 5 in “TPP VARNA” EAD. The scope of the work includes project development, equipment and electrical boards specification and delivery, electrical boards assembly, start-up, commissioning and putting into exploitation.
2009 „POATIE” Ltd. Development and implementation of co-generator thermal energy measurement and control systems. The scope of the work includes thermal energy measurement equipment specification, delivery, on-site mounting, programming, start-up, commissioning and putting into exploitation.
2009 „Profeks Bioproducts” Ltd. Commissioning adjustment and putting into exploitation of the field control and measurement equipment in Bio-ethanol plant – Gorna Malina. The scope of the work includes parametrization, commissioning and adjustment of regulating valves, on/off valves, level measurement and level signaling sensors, flowmeters, pressure transmitters, temperature transmitters, pumps, PH-meter, and density meter.
2010 “Prista Oil Holding” EAD Development and implementation of control system for excisable goods according to the requirements of Customs Agency shown in Regulation № 3 / 19.02.2010. The scope of the work includes project development of the system, equipment delivery, electrical and control boards assembly, controller programming, onsite mounting of the equipment, implementation of automatic reading of the information, start-up, commissioning and putting into exploitation.
2010 “Carlsberg Bulgaria” AD Development and implementation of control system for excisable goods according to the requirements of Customs Agency shown in Regulation № 3 / 19.02.2010. The scope of the work includes project development of the system, equipment delivery, electrical and control boards assembly, controller programming, onsite mounting of the equipment, cabling, implementation of automatic reading of the information, start-up, commissioning and putting into exploitation.
2010 “Balkanpharma Troyan” AD Replacement of relay – contactor management scheme of 7 machines in workshop ”Unguents” with management system based on programmable controllers SIMATIC S7 200 and SIMATIC S7 1200. The scope of the work includes equipment delivery, programming of controllers and operator panels, onsite mounting and wiring of the equipment, start-up, commissioning and putting into exploitation.
2010 Outwoods Automation Ltd. – United Kingdom Development and implementation of SCADA PCS7 system of DC Crudgington plant part of DAIRY CREST – UK and replacement of the existing Mitsubishi controllers with SIEMENS controllers. The scope of the work includes configuration and specification of the equipment, controllers and SCADA system programming, onsite start-up, commissioning and putting into exploitation.
2010 Outwoods Automation Ltd. – United Kingdom Development and implementation of PLC/HMI management system of Butter Reworker installation in DC Crudgington plant part of DAIRY CREST – UK. The scope of the work includes configuration and specification of the equipment, controllers and HMI system programming, onsite start-up, commissioning and putting into exploitation.
2010 Bright Engineering Ltd. Development and implementation of system for automatic level regulation of container 5000m3 in TPP VARNA EAD. The scope of the work includes equipment delivery, programming of controller, programming of WINCC SCADA system, onsite mounting, start-up, commissioning and putting into exploitation.
2010 “Carlsberg Bulgaria” AD Development and implementation of automation system for transporting installation management and malt batching in brew house. The scope of the work includes project development, equipment delivery, electrical and control boards assembly, building and construction work, programming of controller and operator station, start-up, commissioning and putting into exploitation.
2010 PG Process Ltd. – United Kingdom Preparation of technical task and documentation for implementation of new CIP management system in BOOTS – UK. The scope of the work includes onsite investigation and preparation of technical task for the building of new CIP management system with all the necessary requirements and functionalities included.
2010 SIEMENS EOOD Engineering for development and implementation of automation system for data collecting and integrated presenting of the information in substation ”Suvorovo” of wind park “Suvorovo”. The scope of the work includes configuration and programming of SICAM PAS server, configuration and programming of PAS CC operator station, start-up, commissioning and putting into exploitation.
2011 PG Process Ltd. – United Kingdom Development and implementation of management software for the new CIP management system in BOOTS – UK. The scope of the work includes software development for the programmable controllers and the SCADA system, onsite start-up, commissioning and putting into exploitation.
2011 NEOCHIM AD Turn-key development and implementation of management and control system on site “Automation of the management system of the steam installation of NEOCHIM AD”. The scope of the work includes equipment delivery, construction and mounting work, electrical and control boards assembly, building of optic communication network, programming of controllers, programming of network switches, programming od SCADA system, start-up, commissioning and putting into exploitation, personnel training, executive documentation preparing.
2011 NEOCHIM AD Turn-key development and implementation of management and control system of the transport belts in buildings 402, 404 and 405 of workshop area 640 in NEOCHIM AD. The scope of the work includes equipment delivery, construction and mounting work, electrical and control boards assembly, building of optic communication network, programming of controllers, programming of network switches, programming od SCADA system, start-up, commissioning and putting into exploitation, personnel training, executive documentation preparing.
2011 PROVADSOL AD Development and implementation of management control system of pressure pump 6kV. The scope of the work includes equipment delivery, electrical and control board assembly, programming of SIMATIC S7-300 controller, programming of operator panels, management software development, start-up, commissioning and putting into exploitation.
2011 “Carlsberg Bulgaria” AD Delivery, engineering and implementation of technical equipment and BRAUMAT 6.0 software for management and control of the brewing process in Shumen Brewery. The scope of the work includes equipment and system software delivery, revision of the controller software for work with the new version of the BRAUMAT software, revision of the SCADA software for work with the new version of the BRAUMAT software, installation, commissioning and adjustment of operator stations and network equipment, replacement of INTERBUS communication with PROFIBUS, start-up, commissioning and putting into exploitation.
2011 “Balkanpharma Troyan” AD Delivery of equipment and engineering for development and implementation of management and control system of three material pumps and one mixing vessel in workshop “РЦ „Унгвенти”” on the basis of programmable controller SIMATIC ET200S IM151-8 PN/DP, production of SIEMENS AG – Germany. The scope of the work includes equipment delivery, onsite mounting and wiring of the equipment, programming of the controller, programming of the operator panels, start-up, commissioning and putting into exploitation, personnel training.
2011 TPP “ROUSSE” Reconstruction and certification according to module “F” of automatic conveyor belt scale weighers 08A and 08B in Coal Transport Center of TPP “Rousse - East”. The scope of the work includes project development, equipment delivery, onsite mounting and wiring of the equipment, programming of the belt scale weighers, calibration of the weighers, start-up, commissioning and putting into exploitation, personnel training, participation in control tests for certification of the weighers according to module “F” together with authorized certification laboratory.
2011 TPP “ROUSSE” Development, implementation and certification according to module “F” of automatic conveyor belt scale weigher of coal belt transporter 01A in TPP “Rousse - East”. The scope of the work includes project development, equipment delivery, onsite mounting and wiring of the equipment, programming of the belt scale weigher, calibration of the weigher, start-up, commissioning and putting into exploitation, personnel training, participation in control tests for certification of the weigher according to module “F” together with authorized certification laboratory.
2012 “AGROPOLYCHIM” AD Modernization of belt weighing scales W40201 and W40202. The scope of the work includes project development of management and control system of the weighing scales, equipment delivery, laying of cable trays and cables, onsite mounting and wiring of the equipment and distribution boards, programming of controllers, programming of operator panels, start-up, commissioning, putting into exploitation, personnel training, preparation of executive documentation.
2012 “MONTUPET” ЕООD Performance of power supply of compressors № 4 and № 5 and existing compressor Atlas Copco at the plant of “Montupet” EOOD, Ruse. The scope of the work includes assembly, delivery and mounting of distribution boards, delivery of cable trays, cables, and mounting materials, onsite mounting of the distribution boards, mounting of cable trays, laying of power cables, onsite wiring of boards and compressors, performance of the relevant control electric measurements, start-up, commissioning and putting into exploitation.
2012 “MONTUPET” ЕООD Performance of power supply of board for subsidiary equipment in Sand regeneration Hall 3 at the plant of “Montupet” EOOD, Ruse. The scope of the work includes delivery and assembly of distribution board TC33, delivery of cable trays, cables and mounting materials, laying of cable trays and power cables, onsite mounting and wiring of the distribution board, performance of the relevant control electric measurements, start-up, commissioning and putting into exploitation.
2012 “MONTUPET” ЕООD Execution of power supply of Core shop 2.2, in Hall 2 of the plant of “Montupet” EOOD, Ruse. The scope of the work includes delivery and assembly of three distribution boards, delivery of cables and mounting materials, laying of power supply cables, onsite wiring of the boards, performance of the relevant control electric measurements, start-up, commissioning and putting into exploitation.
2012 SIEMENS ЕООD Replacement of distribution switchgear 6kV of Distribution substation 51 (РП51) in “Neochim” AD, Dimitrovgrad. The scope of the work includes equipment delivery, network board assembly, programming and configuration of SICAM PAS server, programming and configuration of 3 pieces SICAM PAS CC work stations, communication programming, integration of AC power adaptors to the controller by Modbus RTU and in the SCADA system, start-up, commissioning and putting into exploitation.
2012 “NEOCHIM” AD Extending of the algorithm and the functionality of the SCADA system in workshop 700 “Power supplying” of “Neochim” AD. The scope of the work includes equipment delivery, integration into SCADA system of eight new EPMS electrometers and two pieces main power switches in Distribution substation RP-8, configuration and programming of SCADA system, development of software for calculation of the power consumption in the factory, start-up, commissioning and putting into exploitation.
2012 “MONTUPET” EOOD Reconstruction of two pieces “IUT –stand-alone ageing heat treatment furnaces”. The scope of the work includes project development, delivery of equipment for control and management, onsite inspection of the field control and measurement equipment, replacing of the damaged parts, control boards assembly, cabling of the furnaces, onsite mounting and wiring of boards and equipment, programming of controller and operator panel, start-up, commissioning and putting into exploitation, personnel training, preparation of executive documentation.
2012 “TITAN” Ltd Development and implementation of automation system for management and control of production line for assembly of flexible plumbing water-pipes. The scope of the work includes project development, delivery of equipment for control, management and field control and measurement, control boards assembly, on-site mounting and wiring of control boards and equipment, programming of controller and operator panel, start-up, commissioning and putting into exploitation, personnel training, preparation of executive documentation.
2012 “Carlsberg Bulgaria” AD Performance of project “Energy Recovery System for Wort Ketle”. The scope of the work includes programming of Braumat system – new screens and integration of new devices, changes in the recipes, related to the system for energy recovery, start-up, commissioning and putting into exploitation.
2012 “NEOCHIM” AD Mounting and wiring of LED indicating devices for the project: “Replacement of distribution switchgear 6kV in Distribution substation 51 (РП51)”. The scope of the work includes project development, delivery of LED indicating devices, technical equipment, cables and mounting materials, board assembly, on-site mounting and wiring of board and equipment, start-up, commissioning and putting into exploitation, preparation of executive documentation.
2012 “Balkanpharma Troyan” AD Changing of the management system of material pumps. The scope of work includes delivery of technical equipment, programming of three controllers SIMATIC S7-200 and six operator panels, on-site mounting and wiring of equipment, start-up, commissioning and putting into exploitation.
2012 Contour Global
TPP “MARITZA EAST 3”
Integration of the process data from the equipment and machines in cinder processing and storage area “ISKRITCA” in TPP “Contour Global Maritza East 3” AD. The scope of work includes project development, delivery of equipment, onsite mounting and wiring of the equipment, programming of controllers, programming of SCADA system, start-up, commissioning and putting into exploitation, preparation of executive documentation.
2012 BULMETAL LTD Development and implementation of automation system for management and control of caps manufacturing line. The scope of the work includes project development, delivery of equipment for control, management and field control, PLC SIEMENS SIMATIC S7-1214С and operator panel SIEMENS KTP600 programming, configuration and commissioning of 6 pieces frequency inverters SIEMENS SINAMICS G110, start-up, commissioning and putting into exploitation, personnel training, preparation of executive documentation.
2012 PPMEO LTD Integration, adjustment and commissioning of the protection devices and putting into exploitation of Electrical part and Communication part on site “KRU46 and KRU48 6.3kV in main substation GPP-1 in NEOCHIM AD”. The scope of the work includes SCADA project development, integration and commissioning of four SIEMENS protection devices and two power meters SATEC PM130E, software installation, start-up, commissioning and putting into exploitation, preparation of executive documentation.
2013 „MONTUPET“ EOOD Power supply of production line №8 of the plant of “Montupet” EOOD in Ruse. The scope of the work includes delivery and laying of power supply cables, manufacturing, delivery and mounting of distribution boards, manufacturing and mounting of bearing structures, cables wiring, manufacturing of power and lighting installation in the base of the band cutting machines, performance of control electrical measurements, commissioning and preparation of performer’s documentation.
2013 „MONTUPET“ EOOD Reconstruction of two new “IUT –stand-alone ageing heat treatment furnaces”. The scope of the work includes project development, delivery of equipment for control and management, onsite inspection of the field control and measurement equipment, replacing of the damaged parts, control boards assembly, cabling of the furnaces, onsite mounting and wiring of boards and equipment, programming of controller and operator panel, start-up, commissioning and putting into exploitation, personnel training, preparation of executive documentation.
2013 “SEM REMONT” LTD Modernization of rail welding machine К355А. The scope of the work includes project development of the control and management system, delivery of equipment, remaking of the existing control board, onsite control board and field equipment wiring, programming of controller SIEMENS SIMATIC S7-1200, programming of laptop computer with SIEMENS WinCC Flexible software for data processing and visualization of the information about the welds, programming of MS Excel scripts, start-up, commissioning and putting into exploitation, personnel training, preparation of executive documentation.
2013 Trakiya Glass Bulgaria EAD Reconstruction of control and management system of glass lapping and drilling machine. The reconstruction includes total replacement of the existing CNC (feed motors, CNC controller and operating modules) of the drilling part with new, modern CNC, production of SIEMENS AG, equipment of the drilling motors and the motors for products movement with frequency inverters SIEMENS SINAMICS G120 to ensure the necessary accuracy in motors operation and their energy effective work and operation and control of the drilling part by modern microprocessor modular controller SIEMENS SIMOTION D425-2 DP and operator panel SIEMENS SIMATIC HMI KTP600. The scope of the work includes project development of the control and management system, delivery of equipment, controller and operator panel programming, onsite mounting and wiring of the equipment, start-up, commissioning and putting into exploitation, personnel training, preparation of executive documentation.
2014 „MONTUPET“ EOOD Performance of Electrical part and the control system of K7 cooling tunnel in the plant of “Montupet” EOOD in Ruse. The scope of the work includes delivery of equipment, construction and mounting work, installation of management and control software, start-up, commissioning and putting into exploitation.
2014 „SIEMENS“ EOOD Replacement of 20kV switchgear in substation 20/6/0.4kV "Maritza" of “Neochim” AD. The scope of the work includes construction and mounting work, integration of power meters and electrometers in the control system of the substation, integration of SIEMENS IED 7SJ62 protection devices, integration of ten modules SIEMENS ET200S in the SCADA system, correction of the mnemonic scheme, correction of the PLC program, RS900 switch configuration, correction and synchronization of the archiving process in the SCADA of the operator stations, start-up, commissioning and putting into exploitation.
2014 “AGROPOLYCHIM” AD Modernization of weighing belts W41201 and W41202, part of the technological scheme of “Phosphoric acid“ workshop of “Agropolychim” AD, Devnya. The scope of the work includes project development of belts control and management system of the belt weighing scales, equipment delivery, laying of cable trays and cables, onsite mounting and wiring of the equipment and distribution boards, programming of controllers, programming of operator panels, start-up, commissioning, putting into exploitation, personnel training, preparation of executive documentation.
2014 RIOSV - Ruse Development and implementation of expert system for automatic measurement and reading of the water level at the two canal locks of the lake of the Nature Reserve “Srebarna” with the possibilities for measurement and reading of other water parameters according to project “Activities for stable development and management of reserve “Srebarna” and reserve “Beli Lom”, approved for financing by Operative program “Environment 2007 – 2013”. The scope of the work includes project development of the system, delivery of equipment, onsite construction and mounting work, programming of the system, onsite installation, commissioning and putting into exploitation, preparation of instruction for working with the system, personnel training, preparation of executive documentation.
2014 “BON” EOOD Development and implementation of 5-channel batch system for seeds. The scope of the work includes project development of the system, delivery of equipment, control board assembly with equipment mounting and wiring to terminal strip, SIMATIC S7-1214 controller programming, SIMATIC HMI KTP600 operator panel programming, onsite start-up, commissioning and putting into exploitation, preparation of instruction for working with the system, personnel training, preparation of executive documentation.
2014 “PRESTIGE 96” AD Modernization and replacement of the existing old SIEMENS SIMATIC S5 equipment for management and control of production line for biscuits "Line Punch Cookies" with contemporary equipment SIEMENS SIMATIC S7. The scope of the work includes project development, delivery of equipment, mounting and wiring of the equipment on the production line, SIMATIC ET200S controller programming, SIMATIC HMI KTP1000 operator panel programming, functional checkup, commissioning and putting into exploitation, preparation of instruction for working with the system, personnel training, preparation of executive documentation.
2014 TPP “ROUSSE” Replacement of protection system of Boiler 7. The scope of the work includes project development, delivery of equipment, onsite construction and mounting work, fail-safe controller programming, SCADA system programming, onsite commissioning, 72-hour tests, preparation of instruction for working with the system, personnel training, preparation of executive documentation.